STATISTICS

Viewed1291

Downloads682

Analysis of the Forces in the Whole Construction Process of the Inclined Column Steel Structure of the Prestressed Beam Foundation
[1]LIANG Yan,ZHAO Zhenghao,DU Xiaoxi,et al.Analysis of the Forces in the Whole Construction Process of the Inclined Column Steel Structure of the Prestressed Beam Foundation[J].Journal of Zhengzhou University (Engineering Science),2022,43(05):78-83.[doi:10.13705/j.issn.1671-6833.2022.05.011]
Copy
References:
[1] 关吉平. 某博物馆大跨拱形入口结构设计[ J] . 结 构工程师, 2018, 34(5) : 13-19. 
GUAN J P. Design of large-span arch entrance structure of a museum[ J] . Structural engineers, 2018, 34 (5) : 13-19.
 [2] 杨伟, 宋汉东. 福州海峡国际会展中心扩建工程西 区钢桁架施工过程监测 [ J] . 结 构 工 程 师, 2017, 33(4) : 200-208. 
YANG W, SONG H D. Construction monitoring of steel trusses for the expansion project of Fuzhou strait international conference exhibition western center[ J] . Structural engineers, 2017, 33(4) : 200-208.
 [3] 刘学武. 大型复杂钢结构施工力学分析及应用研 究[D] . 北京: 清华大学, 2008. 
LIU X W. Analysis and application of construction mechanics of large complex steel structures[D] . Beijing: Tsinghua University, 2008. 
[4] ZHANG W L, WU Z X, CHEN B H. Simulation study on construction process of complex spatial steel structure based on the construction mechanics[ J] . Applied mechanics and materials, 2012, 226 / 227 / 228: 1209- 1213.
 [5] TIAN L M, HAO J P, WANG Y. The analysis of construction mechanical simulation of the large-span steel structure[C] / / 2009 International Conference on Information Management. Piscataway: IEEE, 2009: 150 -153.
 [6] ZHU B H, LI Z J, Chen G D, et al. The construction simulation of the large span steel roof of zayed national stadium [ C ] / / Proceeding of Shanghai International Conference on Technology of Architecture and Structure. Shanghai: Tongji University Press, 2009: 51 -58.
 [7] YAO G, WU C Y, YANG Y. Scientometric analysis for mechanical performance of broken-line long-span steel structure in construction considering geometric nonlinearity[ J] . Symmetry, 2021, 13(7) : 1229.
 [8] 王昌兴, 徐珂, 田立强. 洛阳隋唐城天堂遗址保护建 筑结构设计[J]. 钢结构, 2011, 26(8): 32-36, 79. 
WANG C X, XU K, TIAN L Q. Structure design of Tiantang for the protection of the Ruins of ancient buildings built in the Sui and Tang dynasty in Luoyang City [J]. Steel construction, 2011, 26(8): 32-36, 79. 
[9] 冯浩琪, 梁岩, 管品武, 等. 大跨钢结构基础预应 力施工过程桩土作用影响分析[ J] . 结构工程师, 2020, 36(3) : 184-190. 
FENG H Q, LIANG Y, GUAN P W, et al. Analysis of pile-soil interaction during prestressed construction of long-span steel structure foundation [ J] . Structural engineers, 2020, 36(3) : 184-190.
 [10] 中华人民共和国建设部. 建筑桩基技术规范: JGJ 94—2008[ S] . 北京: 中国建筑工业出版社, 2008. 
Ministry of Construction of the People′ s Republic of China. Technical code for building pile foundations: JGJ 94—2008 [ S ] . Beijing: China Architecture & Building Press, 2008. 
[11] 贺拴海, 贺小卫. 基于地基系数法的横向受荷桩通 解研究 [ J] . 郑 州 大 学 学 报 ( 工 学 版) , 2016, 37 (3) : 64-68.
 HE S H, HE X W. The study of lateral load pile general solution based on modulus of subgrade reaction [ J ] . Journal of Zhengzhou university ( engineering science) , 2016, 37(3) : 64-68. 
[12] CHANG H, XIA J W. Constitutive model of disturbed soil-structure interface within mining subsidence areas [ J ] . Journal of central south university, 2017, 24 (7) : 1676-1683.
Similar References:
Memo

-

Last Update: 2022-08-23
Copyright © 2023 Editorial Board of Journal of Zhengzhou University (Engineering Science)