STATISTICS

Viewed728

Downloads629

Optimal Operation of Electric Heating Network Based on Variable Energy Efficiency of Energy Hub
[1]LI Hongwei,JING Haojie,WU Lei,et al.Optimal Operation of Electric Heating Network Based on Variable Energy Efficiency of Energy Hub[J].Journal of Zhengzhou University (Engineering Science),2023,44(06):76-83.[doi:10.13705/j.issn.1671-6833.2023.04.015]
Copy
References:
[1] 曾博, 徐富强, 刘裕, 等. 考虑可再生能源与需求响应 协同增效的能量枢纽多目标区间优化规划方法[J]. 中 国电机工程学报, 2021, 41(21): 7212-7224. 
ZENG B, XU F Q, LIU Y, et al. Multi-objective interval optimization approach for energy hub planning with consideration of renewable energy and demand response synergies[ J] . Proceedings of the CSEE, 2021, 41 ( 21) : 7212-7224. 
[2] 陆信辉, 周开乐, 杨善林. 能源互联网环境下基于分 布鲁棒优化的能量枢纽负荷优化调度[ J] . 系统工程 理论与实践, 2021, 41(11) : 2850-2864. 
LU X H, ZHOU K L, YANG S L. Optimal load dispatch of energy hub based on distributionally robust optimization approach in energy internet environment[ J] . Systems Engineering —Theory & Practice, 2021, 41 ( 11 ) : 2850 -2864.
 [3] THANG V V, HA T, LI Q H, et al. Stochastic optimization in multi-energy hub system operation considering solar energy resource and demand response [ J ] . International Journal of Electrical Power & Energy Systems, 2022, 141: 108132. 
[4] DINI A, HASSANKASHI A, PIROUZI S, et al. A flexible-reliable operation optimization model of the networked energy hubs with distributed generations, energy storage systems and demand response [ J ] . Energy, 2022, 239: 121923.
 [5] 李政洁, 于强, 龚文杰, 等. 计及模糊机会约束的电气-热能源枢纽多目标优化调度[ J] . 电力系统及其自 动化学报, 2021, 33(9) : 49-56. 
LI Z J, YU Q, GONG W J, et al. Multi-objective optimal scheduling of electricity-gas-heat energy hub considering fuzzy chance constraint [ J ] . Proceedings of the CSU-EPSA, 2021, 33(9) : 49-56.
 [6] 熊宇峰, 陈来军, 郑天文, 等. 考虑电热气耦合特性 的低碳园区综合能源系统氢储能优化配置[ J] . 电力 自动化设备, 2021, 41(9) : 31-38. 
XIONG Y F, CHEN L J, ZHENG T W, et al. Optimal configuration of hydrogen energy storage in low-carbon park integrated energy system considering electricity-heatgas coupling characteristics[ J] . Electric Power Automation Equipment, 2021, 41(9) : 31-38. 
[7] 常雨芳, 王豪, 谢昊, 等. 采用矩阵建模方式的冷热 电联供系统运行优化[ J] . 华侨大学学报( 自然科学 版) , 2018, 39(2) : 233-239. 
CHANG Y F, WANG H, XIE H, et al. Operation optimization of combined cooling heating and power systems using matrix modeling approach[J]. Journal of Huaqiao University (Natural Science), 2018, 39(2): 233-239. 
[8] WANG Y, ZHANG N, KANG C Q, et al. Standardized matrix modeling of multiple energy systems [ J ] . IEEE Transactions on Smart Grid, 2019, 10(1) : 257-270.
 [9] WANG Y, CHENG J N, ZHANG N, et al. Automatic and linearized modeling of energy hub and its flexibility analysis[ J] . Applied Energy, 2018, 211: 705-714. 
[10] 陈晚晴, 穆云飞, 贾宏杰, 等. 考虑设备变工况特性 的区域综合能源系统优化调度方法[ J] . 电网技术, 2021, 45(3) : 951-958. 
CHEN W Q, MU Y F, JIA H J, et al. Optimal scheduling method of regional comprehensive energy system considering equipment off-design characteristics [ J ] . Power System Technology, 2021, 45(3) : 951-958. 
[11] 李虹, 杜世旗. 考虑能源枢纽变工况特性的综合能源 系统优化配置[J]. 现代电力, 2022, 39(5): 547-553. 
LI H, DU S Q. Optimal configuration of integrated energy system considering variable condition characteristics of energy hub[ J] . Modern Electric Power, 2022, 39( 5) : 547-553.
 [12] HUANG W J, ZHANG N, WANG Y, et al. Matrix modeling of energy hub with variable energy efficiencies [ J] . International Journal of Electrical Power & Energy Systems, 2020, 119: 105876. 
[13] ZHENG J H, HUANG J, DENG S, et al. Comparison and error analysis of off-design and design models of energy hubs [ J ] . CSEE Journal of Power and Energy Systems, 2019, 5(4) : 454-465. 
 [14] CHEN S J, YANG Y B, XU Q S. A coordinated approach of multi-energy system considering the off-design characteristics of the devices in energy hub[ J] . International Transactions on Electrical Energy Systems, 2021, 31(11) : 1-24.
 [15] 陈磊, 徐飞, 王晓, 等. 储热提升风电消纳能力的实 施方式及效果分析[ J] . 中国电机工程学报, 2015, 35 (17) : 4283-4290. 
CHEN L, XU F, WANG X, et al. Implementation and effect of thermal storage in improving wind power accommodation[ J] . Proceedings of the CSEE, 2015, 35(17) : 4283-4290.
 [16] 李红伟, 周海林, 韩璐, 等. 基于能量枢纽的区域电热网优化运行研究[ J] . 电力科学与工程, 2020, 36 (10) : 29-35. 
LI H W, ZHOU H L, HAN L, et al. Study on optimal operation of regional electric and thermal power grid based on energy hub[ J] . Electric Power Science and Engineering, 2020, 36(10) : 29-35. 
[17] LI R, CHEN L J, YUAN T J, et al. Optimal dispatch of zero-carbon-emission micro Energy Internet integrated with non-supplementary fired compressed air energy storage system [ J] . Journal of Modern Power Systems and Clean Energy, 2016, 4(4) : 566-580.
 [18] DEL HOYO A I, L􀆕PEZ S H, L􀆕PEZ P S, et al. Models for fast modelling of district heating and cooling networks[ J] . Renewable and Sustainable Energy Reviews, 2018, 82: 1863-1873.
 [19] FARIVAR M, LOW S H. Branch flow model: relaxations and convexification—part I [ J ] . IEEE Transactions on Power Systems, 2013, 28(3) : 2554-2564. 
[20] 章健, 熊壮壮, 王明东, 等. 基于二阶锥规划的主动 配电网动态无功优化[ J] . 郑州大学学报( 工学版) , 2019, 40(1) : 32-37. 
ZHANG J, XIONG Z Z, WANG M D, et al. Dynamic reactive power optimization in active distribution network based on second-order cone programming[ J] . Journal of Zhengzhou University ( Engineering Science) , 2019, 40 (1) : 32-37.
[21] 熊文涛, 雍龙泉. 基于 Yalmip 工具箱的整数规划模型 求解方法[ J]. 湖 北 工 程 学 院 学 报, 2014, 34 ( 3):41 -45. 
XIONG W T, YONG L Q. A method for solving integer programming model using Yalmip toolbox[ J] . Journal of Hubei Engineering University, 2014, 34(3) :41-45. 
[22] 章健, 张玉晓, 熊壮壮, 等. 计及 DR 的新能源配电网 电压 无 功 协 调 优 化 [ J] . 郑 州 大 学 学 报 ( 工 学 版) , 2020, 41(2) : 61-66. ZHANG J, ZHANG Y X, XIONG
Similar References:
Memo

-

Last Update: 2023-10-22
Copyright © 2023 Editorial Board of Journal of Zhengzhou University (Engineering Science)