[1]WANG Jinlong,ZHANG Jiafa,CUl Haodong,et al.Dewatering Measures for Construction Period of the Typical CanalStretch of Middle Route Project of SNWT[J].Journal of Zhengzhou University (Engineering Science),2012,33(05):82-86.[doi:10.3969/j.issn.1671-6833.2012.05.018]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
33
Number of periods:
2012 05
Page number:
82-86
Column:
Public date:
2012-09-10
- Title:
-
Dewatering Measures for Construction Period of the Typical CanalStretch of Middle Route Project of SNWT
- Author(s):
-
WANG Jinlong; ZHANG Jiafa; CUl Haodong; etc;
-
1.Key l.aboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,Yangtze River Scientific Re.search Institute Wuhan 430010,China; 2. National Rescarch Center for Dam Safety Technology, Wuhan 430010,China
-
- Keywords:
-
south-north water transfer project; foundation pit dewatering; seepage field
- CLC:
-
TV223.4
- DOI:
-
10.3969/j.issn.1671-6833.2012.05.018
- Abstract:
-
The groundwater is an important factor for the safety of foundation pit, In order to analyse the distri-.bution of seepage field under different calculating conditions with seepage control measures, a typical canalstretch was modeled for construction period of Middle Route Project of $NWT, The numerical simulation re.sults show that the pit safety would decrease with the less permeable layer being excavated step by step and aquifer confined beneath it , so measures should be taken to control and regulate the seepage field. The efficiencyof foundation pit dewatering would be affected by the water recharge boundary, the thickness and permeabilityof the aquifer , the arrangement of dewatering wells, and so on.