[1]Jiang Shuixin.Investigation and analysis of installed capacity utilization hours of hydropower stations in Henan Province[J].Journal of Zhengzhou University (Engineering Science),1980,1(02):42-47.
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
1
Number of periods:
1980 02
Page number:
42-47
Column:
Public date:
1980-12-01
- Title:
-
Investigation and analysis of installed capacity utilization hours of hydropower stations in Henan Province
- Author(s):
-
Jiang Shuixin
-
Department of Water Conservancy, Zhengzhou Institute of Technology
-
- Keywords:
-
-
- CLC:
-
-
- DOI:
-
-
- Abstract:
-
China’s hydropower reserves are about 680 million kilowatts, accounting for the first place in the world.In 1979, the installed capacity of large and medium-sized hydropower stations in operation was about 16 million kilowatts, and the annual electricity generation was 46.6 billion kilowatts.The national average installed capacity utilization hours are 2,910 hours.The country’s small hydropower resources are 150 million kilowatts, has been built small hydropower station (refers to a single capacity of more than 500 kilowatts, power station capacity is below 12000 kilowatts) installed capacity of 6.34 million kilowatts, annual power generation of 12 billion degrees, the national average installed capacity utilization hours