[1]CHEN Guixiang,SONG Jiule,ZHANG Zhao.The Research on Metro Station Scheduling Optimization Based onImproved Critical Chain Technology[J].Journal of Zhengzhou University (Engineering Science),2012,33(05):25-29.[doi:10.3969/j.issn.1671-6833.2012.05.006]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
33
Number of periods:
2012 05
Page number:
25-29
Column:
Public date:
2012-09-10
- Title:
-
The Research on Metro Station Scheduling Optimization Based onImproved Critical Chain Technology
- Author(s):
-
CHEN Guixiang; SONG Jiule; ZHANG Zhao
-
1.School of Givil Engineering, ’Tongji University, Shanghai 200092, China; 2. School of Civil Engineering and Architecture,Henan l!niversity of Technology, 2hengzhou 450001, China; 3. $ehool of Civil Engineering and Architecture, Henan Universityof Technology,Zhengzhou 200092 ,China
-
- Keywords:
-
Metro; critical chain ; application
- CLC:
-
TU94
- DOI:
-
10.3969/j.issn.1671-6833.2012.05.006
- Abstract:
-
Based on the analysis of theory of constraint and eritical chain , this paper firstly illustrates the ad-vantages of critical chain method for dealing with the projeet overrun and project scheduling management. See.ondly , this paper presents the principles and methods about constraint classfication, safety size and buffer sizebased on the Metro scheduling characters. Finally, a computational example is given and the results show thatthe approach is effective.