[1]LI Zongkun,YE Qing,LI Feng.Risk Analysis of Earth-rock Dam Based on Unascertained Analytic Network Process[J].Journal of Zhengzhou University (Engineering Science),2012,33(01):11-15.[doi:10.3969/j.issn.1671-6833.2012.01.003]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
33
Number of periods:
2012 01
Page number:
11-15
Column:
Public date:
2012-01-10
- Title:
-
Risk Analysis of Earth-rock Dam Based on Unascertained Analytic Network Process
- Author(s):
-
LI Zongkun; YE Qing; LI Feng
-
(1.School of water Conservancy and Environment, 2henyzhow Wniversity, 2hengzhou 450001 ,China; 2. Henan Province WaterConservancy Seientife Research Institute,Zhengzhou 450003 ,China
-
- Keywords:
-
risk analysis; unascertained measure; analylic network process; earth-rock dam
- CLC:
-
TV641
- DOI:
-
10.3969/j.issn.1671-6833.2012.01.003
- Abstract:
-
In view of the risk analysis’s dependance on expert’s judgment on unascertained information, anew method named unascertained-analylic network process was proposed combining unascertained measurecomprehensive evaluation model with analytie nelwork process. The basic theory was introduced in particulaand the method was then applied to an earth-rock dam’s risk analysis, The result is congistent with that analyzed with fuzzy analytic hierarehy process, which indicates that the proposed method is feasible and reasona.ble