- Title:
-
Optimal management of the structure of fully cast-in-place tower residential buildings
- Author(s):
-
HAO Tong; XU Huaxia; Square wave
-
-
- Keywords:
-
- CLC:
-
-
- DOI:
-
10.3969/j.issn.1671-6833.2002.02.024
- Abstract:
-
In the management of the construction process of the fully cast-in-place tower residential building structure, in order to ensure the realization of the goal of creating a high-quality structure, it is necessary to focus on the preparation of construction organization design, the preparation of formwork scheme, concrete maintenance, mold removal and finished product protection and other management points to control, formulate corresponding management measures, and pay attention to the use of living specifications in the construction of each sub-project, deepen the process design of special links, and ensure the actual implementation of measures. Implement a daily joint inspection and coordination system to ensure the coordination between projects of various sub-divisions. The management method of model guidance and chart coordination is adopted to ensure the high quality of each sub-project.