[1]Ma Xixia,He North,Ma Zhuqing,et al.Comprehensive utilization of reservoir optimal scheduling function research[J].Journal of Zhengzhou University (Engineering Science),1995,16(03):65-68.
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
16
Number of periods:
1995 03
Page number:
65-68
Column:
Public date:
1995-03-28
- Title:
-
Comprehensive utilization of reservoir optimal scheduling function research
- Author(s):
-
Ma Xixia; He North; Ma Zhuqing; Zhao Yang;
-
Zhengzhou Institute of Technology, Zhengzhou Water Conservancy School, Henan Academy of Agricultural Sciences,
-
- Keywords:
-
Hidden random optimization; math model; optimize scheduling; scheduling function
- CLC:
-
-
- DOI:
-
-
- Abstract:
-
This article first uses a certain dynamic planning method to solve the use of a comprehensive use of a reservoir with a combination of flood prevention and irrigation to obtain the optimal trajectory, and then use a diverse return method to formulate the scheduling function within one year. Based on this as the basis, a long series of simulation operation was performed. The technical route used in this article is successful.