[1]He North,Lu Tingjun,Moon runoff sequence seasonal Arima model[J].Journal of Zhengzhou University (Engineering Science),1992,13(03):47-53.
                                
                                Copy
                                
                                
                             
                            
                                
                                    Journal of Zhengzhou University (Engineering Science)[ISSN
                                    1671-6833/CN
                                    41-1339/T] Volume:
                                    13
                                    Number of periods:
                                    1992 03
                                    Page number:
                                    47-53
                                    Column:
                                    
                                    Public date:
                                    1992-09-28
                                
                                
                                    - Title:
 
                                    - 
                                        Moon runoff sequence seasonal Arima model
 
                                
                                
                                
                                    - Author(s):
 
                                    - 
                                        He North; Lu Tingjun;
 
                                    - 
                                        Zhengzhou Institute of Technology Water Trail, Zhengzhou Institute of Technology Water Trail,
 
                                    - 
                                
 
                                
                                    - Keywords:
 
                                    - 
                                        Moon runoff;  time sequence analysis;  forecast
 
                                
                                
                                    - CLC:
 
                                    - 
                                        -
 
                                
                                
                                    - DOI:
 
                                    - 
                                        -
 
                                
                                
                                
                                    - Abstract:
 
                                    - 
                                        Based on the characteristic of a category of cyclical non -smooth time sequence, this article establishes a seasonal Arima model. The electrical calculation program is prepared in the article, and the monthly runoff forecast of the reservoir is used to obtain satisfactory results.