STATISTICS

Viewed2450

Downloads1800

Research on Early-warning Method for Super High-rise Building Construction Considering Coupling Effect of Risk Factors
[1]Shenyang,Xu Lei,Zheng Guanyu,et al.Research on Early-warning Method for Super High-rise Building Construction Considering Coupling Effect of Risk Factors[J].Journal of Zhengzhou University (Engineering Science),2021,42(04):98-104.[doi:10.13705/j.issn.1671-6833.2021.04.020]
Copy
References:
[1] YU-TING E,ZHOU L.The research on the current safety status of high-rise building at home and abroad[J].Procedia engineering,2016,135:574-577.
[2] 龚剑,房霆宸,夏巨伟.我国超高建筑工程施工关键技术发展[J].施工技术,2018,47(6):19-25.
[3] 龚剑.超高结构建造整体钢平台模架装备技术[M].北京:中国建筑工业出版社,2018.
[4] 陆彬,袁金虎,任治兵.基于AHP的超高层建筑施工易发安全事故风险因素研究[J].建筑安全,2020,35(9):59-62.
[5] 张伟,朱双娜,张潇,等.建筑施工安全事故致因系统模型与实证分析[J].中国安全科学学报,2019,29(6):56-62.
[6] 李宗坤,王特,葛巍,等.基于WBS-RBS和AHP的港珠澳大桥人工岛建设风险分析[J].郑州大学学报(工学版),2020,41(3):62-66.
[7] 周红波,杨奇,杨振国,等.基于复杂网络和N-K模型的塔吊安全风险因素分析与控制[J].安全与环境学报,2020,20(3):816-823.
[8] 周红波,孟柯,黄明耀.基于修正系数法的大型建筑工程施工风险耦合效应研究[J].建筑技术,2014,45(9):829-832.
[9] 何光辉,李鑫奎,沈志勇.考虑多风险源耦合作用的建筑工程施工人员安全状态评价[J].建筑施工,2020,42(1):125-127.
[10] YUE F,YUAN Y,LI G Q,et al.Wind load on integral-lift scaffolds for tall building construction[J].Journal of structural engineering,2005,131(5):816-824.
[11] 范峰,王化杰,金晓飞,等.超高层施工监测系统的研发与应用[J].建筑结构学报,2011,32(7):50-59.
[12] 左自波,潘曦,黄玉林,等.超高层ICCP安全监测与控制的预警指标研究[J].中国安全科学学报,2020,30(1):53-60.
[13] LI Q S,LI X,HE Y C.Monitoring wind characteristics and structural performance of a supertall building during a landfall typhoon[J].Journal of structural engineering,2016,142(11):04016097.
[14] 中华人民共和国住房和城乡建设部.整体爬升钢平台模架技术标准:JGJ 459—2019[S].北京:中国建筑工业出版社,2019.[15] 中国工程建设标准化协会.超高层建筑施工安全风险评估与控制标准:T/CECS 671—2020[S].北京:中国建筑工业出版社,2020.
Similar References:
Memo

-

Last Update: 2021-08-26
Copyright © 2023 Editorial Board of Journal of Zhengzhou University (Engineering Science)