[1]Li Zongkun,Wu Sai,Li Dingbin,et al.Risk Analysis of Land Requisition and Resettlement in Tidal River Section of the South to North Water Diversion Middle Route Project[J].Journal of Zhengzhou University (Engineering Science),2016,37(04):57-61.[doi:10.13705/j.issn.1671-6833.2016.04.013]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
37
Number of periods:
2016 04
Page number:
57-61
Column:
Public date:
2016-08-31
- Title:
-
Risk Analysis of Land Requisition and Resettlement in Tidal River Section of the South to North Water Diversion Middle Route Project
- Author(s):
-
Li Zongkun1; Wu Sai1; Li Dingbin2; Zhang Xichen2
-
1. School of Water Resources and Environment, Zhengzhou University, Zhengzhou, Henan 450001. 2. Office of the Immigration Work Leading Group of the People’s Government of Henan Province, Zhengzhou, Henan 450008
-
- Keywords:
-
south to north water diversion middle route project; land requisition and resettlement; WBS-RBS; AHP; risk degree
- CLC:
-
-
- DOI:
-
10.13705/j.issn.1671-6833.2016.04.013
- Abstract:
-
In view of the problem that the risk that exists in land requisition and resettlement of the south tonorth water diversion middle route project is so much and changes with the implementation progress,This pa-per taking Tidal River section as an example,on the basis of analyzing work characteristics and risk origin,i-dentifies risks fully dynamically through building WBS-RBS matrix and calculates the weight and degree ofrisks based on AHP and risk degree theory. Finally,it makes comprehensive evaluation according to the level5 risk criteria.The result shows that the overall risk is level 3 medium with the greatest risk ranking level 4 inresettlement phase,which is basically consistent with the engineering investigation result and should be spe-cially focused on.