STATISTICS

Viewed4490

Downloads2653

The Analysis of Comprehensive Assessment Method on Multi-sectionCoordination of Power Network Planning
[1]Xu Min,Shen Jinglei,Yan Zhenshan.The Analysis of Comprehensive Assessment Method on Multi-sectionCoordination of Power Network Planning[J].Journal of Zhengzhou University (Engineering Science),2016,37(01):24-28.[doi:10.3969/j.issn.1671-6833.201410032]
Copy
References:
[1]李春祥,牛东晓,孟丽敏.基于层次分析法和径向基函数神经网络的中长期负荷预测综合模型[J].电网技术,2009,33( 2) :4 -6.
[2]曹炳元.应用模糊数学与系统[M].北京:科学出版社,2005 :66 -72.
[3]张文亮,周孝信,印永华,等.华北–华中–华东特高压同步电网构建和安全性分析[J].中国电机工程学报,2010 ,30(16) : 1 -5
[4]CARRERAS B A,NEWMAN D E,DOBSON 1,et al.“Evidence for Self Organized Criticality in Electric PowerSystem Blackouts”[ C]// Hawaii international conferenceon system sciences. Maui Hawaii:IEEE Press,2001 .
[5]杨高峰,康重庆,谷兴凯,等.电力市场中基于情景分析的电网规划方案适应性评价[J].电网技术,2006,30( 14) : 64 - 70.
[6]李晨光,郭剑波,张东霞.国外电网规划可靠性准则综述[J.中国电力,2000 ,33( 10):28 - 30.
[7]刘敦楠,陈雪青,何光宇,等.电力市场评价指标体系的原理和构建方法[J].电力系统自动化, 2005 ,
Similar References:
Memo

-

Last Update:
Copyright © 2023 Editorial Board of Journal of Zhengzhou University (Engineering Science)