[1]ZHANG Baosen,WANG ZhongFu,TIAN Zhizong.The Optimization Design Study Based the Lower Yellow RiverPrestressed Pipe Pile Spur Dikes Structure[J].Journal of Zhengzhou University (Engineering Science),2012,33(05):96-99,129.[doi:10.3969/j.issn.1671-6833.2012.05.021]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
33
Number of periods:
2012 05
Page number:
96-99,129
Column:
Public date:
2012-09-10
- Title:
-
The Optimization Design Study Based the Lower Yellow RiverPrestressed Pipe Pile Spur Dikes Structure
- Author(s):
-
ZHANG Baosen; WANG ZhongFu; TIAN Zhizong
-
1. Yellow River Institute of Hydraulic Research Zhengzhou 450000,China;2. Research Center on levee Saety & Disaster Prevention Minisry of Water Resources Zhengzhou 450000,China:3, North China University of Water Conservaney and HydroeleetricPower ,Institute of Geotechnical and Hydraulic Engineering, Zhengzhou 450011 ,China
-
- Keywords:
-
spur dike ; orthogonal design; FLAC3D; prestressed pipe pile; scour depth
- CLC:
-
TV85
- DOI:
-
10.3969/j.issn.1671-6833.2012.05.021
- Abstract:
-
New prestressed pipe pile is presented on the basis of analysis of the characteristics of traditionalroekfill groins. Take Huayuankou for example, the eombination of the orthogonal experiment principle of thespur dikes sructure design, the overall displacement law with the parameters change of spur dikes is analyzedby FLAC3D finite difference code. The numerical results show that spur dikes of the horizontal displacement olthe contribution of primary and secondary order as follows: the seour depth of pile length > flow rate > pilespacing and pile diameter > contacts beam size; under the operalion conditions of flood flow 4 000 m’, watervelocity of 3 m/s, the seour depth is 16m operating conditions, the spur dikes structure program of the pilelength 25m 0.6m pile spacing, pile diameter is 600 mm, contact beam size is 0. 6 m x0.6 m is optimal, tothe safely factor of strength reduction method is 1.32.