[1]WANG Ruimin,LI Na.Research on and Application of Project Monitoring and Control Process[J].Journal of Zhengzhou University (Engineering Science),2012,33(04):73-76.[doi:10.3969/j.issn.1671-6833.2012.04.017]
Copy
Journal of Zhengzhou University (Engineering Science)[ISSN
1671-6833/CN
41-1339/T] Volume:
33卷
Number of periods:
2012 04
Page number:
73-76
Column:
Public date:
2012-07-10
- Title:
-
Research on and Application of Project Monitoring and Control Process
- Author(s):
-
WANG Ruimin; LI Na
-
1. College of Information Engineering, Zhengzhou University, Zhengzhou 450001 , China; 2. Department of Computer Science.Luohe Voeational and Technical Cnllege,luohe 462000 .China
-
- Keywords:
-
CMMl; SPl; specific goals ; specific practices; typical weaknesses; project monitoring and control
- CLC:
-
TP311
- DOI:
-
10.3969/j.issn.1671-6833.2012.04.017
- Abstract:
-
The Capability Matrity Model® Integration ( CMMI® ) is applied to management, improvement andevaluation on software process. The aim of CMMl is the improvement on sotware process. The SPl( SoftwareProcess Improvement) can not be separated from projects monitoring and control. But the CMMl did not showus how to build up and practice it. When some software organizations want to build up their CMMl system,they met many difficulties in the process of monitoring and control. To find out an effective way of implemen.ting the project monitoring and control process area of CMMl, this paper make some research on the typicalweaknesses in the SPl and a template is put forward which is more available and customizable.