[1]ZHAO Jingying,CHANG Liang.Improving the Automation Level of AS/RS Based on Simulation with Flexsim[J].Journal of Zhengzhou University (Engineering Science),2012,33(02):95-98.[doi:10.3969/j.issn.1671-6833.2012.02.023]
                                
                                Copy
                                
                                
                             
                            
                                
                                    Journal of Zhengzhou University (Engineering Science)[ISSN
                                    1671-6833/CN
                                    41-1339/T] Volume:
                                    33
                                    Number of periods:
                                    2012 02
                                    Page number:
                                    95-98
                                    Column:
                                    
                                    Public date:
                                    2012-03-10
                                
                                
                                    - Title:
 
                                    - 
                                        Improving the Automation Level of AS/RS Based on Simulation with Flexsim
 
                                
                                
                                
                                    - Author(s):
 
                                    - 
                                        ZHAO Jingying; CHANG Liang
 
                                    - 
                                        1. College of Mechanical & Electrical Engineering, Guangdong University of Petrochemical Technology, Maoming 525000.China; 2. School of Computer Seience & Engineering, Guilin University of Electronie Technology,Guilin 541004, China
 
                                    - 
                                
 
                                
                                    - Keywords:
 
                                    - 
                                        AS/RS; automation level;  simulation;  Flexsim
 
                                
                                
                                    - CLC:
 
                                    - 
                                        TP202.7
 
                                
                                
                                    - DOI:
 
                                    - 
                                        10.3969/j.issn.1671-6833.2012.02.023
 
                                
                                
                                
                                    - Abstract:
 
                                    - 
                                        With existing equipment of AS/RS as the main basis, this paper puts forward oplimization measuresthat can improve automation level of AS/RS , to meet the needs of normal production and achieve the core ob.jective to reduce 10% storage space. Operation results of Flexsim simulation model show the comparison be-tween optimization scheme and current scheme : the maximum utilization rate of single package depot increasesby 12. 3696 , the average utilization rate of multi-body package depot increases by 5. 32%6 , the average utiliza-tion rate of entire board depot increases by l.279% , and the safety stock needs of factory is not affected.