- Title:
-
Analysis
- Author(s):
-
Ma Lipeng; You Ruichang; Wang Yi cone;
-
The Kunming Survey and Design Institute of Energy and Water Resources, Kunming Survey and Design Institute of Energy and Ministry of Water Resources, Kunming Survey and Design Institute of the Ministry of Energy and Water Resources
-
- Keywords:
-
Enter the water tower; space finite element; structural analysis
- CLC:
-
-
- DOI:
-
-
- Abstract:
-
This calculation takes the entire water inlet tower as the research object, and the tower body unit has conducted detailed scores, and the foundation of double tower height is intercepted. It is a large -scale spatial finite element analysis topic that is closely combined with the actual project. The calculation conditions are divided into two types: runtime and blocking period. The blocking period has comparative analysis and argumentation of Hougashan body support and no mountain support support. Through analysis, the stress conditions and stress stress stress stress stress stress response laws of the water inlet tower were found to solve the problems that could not be solved by structural mechanics analysis methods. The results of this analysis have been used in production reality, and have played a guidance for the body shape and structure with the structure of the Tiansheng Bridge 1 -level power station.