[1]刘立新,刘中琦..螺旋肋钢丝(PC棒)预应力传递长度的试验研究[J].郑州大学学报(工学版),2009,30(04):11-14.
 LIU Lixin,LIU Zhongqi.Experimental Study on the Transmission Length of Prestressed Reinforcementwith Helical Rib(PC Steel Bars)in Concrete[J].Journal of Zhengzhou University (Engineering Science),2009,30(04):11-14.
点击复制

螺旋肋钢丝(PC棒)预应力传递长度的试验研究()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
30
期数:
2009年04期
页码:
11-14
栏目:
出版日期:
1900-01-01

文章信息/Info

Title:
Experimental Study on the Transmission Length of Prestressed Reinforcementwith Helical Rib(PC Steel Bars)in Concrete
作者:
刘立新刘中琦.
郑州大学土木工程学院,河南郑州,450001, 郑州大学土木工程学院,河南郑州,450001
Author(s):
LIU Lixin; LIU Zhongqi
School of Civil Engineering,Zhengzhou University,Zhengzhou 450001,China
关键词:
PC棒 预应力 传递长度
Keywords:
elical prestressing reinforcement(PC steel bars)prestressingtransmission length
文献标志码:
A
摘要:
螺旋肋钢丝(简称PC棒)是我国新研制开发的用于顸应力混凝土结构的新型钢丝.通过对28个先张法构件端部区域混凝土应变的量测,分析了PC棒预应力传递长度范围内混凝土应变和应力的变化规律以及主要影响因素,提出了PC棒预应力传递长度计算公式的建议,为PC棒的工程应用提供了依据.
Abstract:
his paper presents the results of transmission length tests on 28 pre—tensioned members made ofprestressing reinforcement with helical rib(PC steel bars).The compressive strain and stress of concrete with—in the prestressing transm ission zone for the PC steel bars of the members are analyzed,and the factors affect—ing the transmission length of PC steel bars in concrete are also discussed,and a formula for calculating thetransmission length is suggested.The result can provide reference for the application of PC steel bars in con—crete strueture.

相似文献/References:

[1]郭馨艳,黄培彦,杨怡,等.预应力FRP增强RC梁界面剪应力分析[J].郑州大学学报(工学版),2007,28(01):60.[doi:10.3969/j.issn.1671-6833.2007.01.015]
 GUO Xinyan,HUANG Peiyan,YANG Yi,et al.Interfacial shear stress analysis of prestressed FRP-reinforced RC beam[J].Journal of Zhengzhou University (Engineering Science),2007,28(04):60.[doi:10.3969/j.issn.1671-6833.2007.01.015]
[2]孙玉永,肖红菊,张雷顺..无黏结部分预应力混凝土变截面公路桥的有限元分析[J].郑州大学学报(工学版),2007,28(03):16.[doi:10.3969/j.issn.1671-6833.2007.03.005]
 SUN Yuyong,XIAO Hongju,Zhang Leishun.Finite element analysis of variable section highway bridge of unbonded partially prestressed concrete[J].Journal of Zhengzhou University (Engineering Science),2007,28(04):16.[doi:10.3969/j.issn.1671-6833.2007.03.005]
[3]刘立新,安鸿飞,于秋波,等.淮河大桥35 m先张折线形箱梁预应力损失的研究[J].郑州大学学报(工学版),2007,28(04):12.[doi:10.3969/j.issn.1671-6833.2007.04.004]
 LIU Lixin,An Hongfei,YU Qiubo,et al.Study on prestress loss of 35 m pre-tensioned linear box girder of Huaihe River Bridge[J].Journal of Zhengzhou University (Engineering Science),2007,28(04):12.[doi:10.3969/j.issn.1671-6833.2007.04.004]
[4]胡良明,李宗坤,王宗敏,等.小浪底2号进水塔工作门段预应力分析[J].郑州大学学报(工学版),2002,23(02):89.[doi:10.3969/j.issn.1671-6833.2002.02.026]
 HU Liangming,Li Zongkun,WANG Zongmin,et al.Prestress analysis of working door section of Xiaolangdi No. 2 inlet tower[J].Journal of Zhengzhou University (Engineering Science),2002,23(04):89.[doi:10.3969/j.issn.1671-6833.2002.02.026]

更新日期/Last Update: 1900-01-01