[1]孙利民.有缝坝的接触应力与温度应力分析[J].郑州大学学报(工学版),1995,16(01):105-108.
 Sun Limin.Analysis of contact stress and temperature stress of sewing dam[J].Journal of Zhengzhou University (Engineering Science),1995,16(01):105-108.
点击复制

有缝坝的接触应力与温度应力分析()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
16卷
期数:
1995年01期
页码:
105-108
栏目:
出版日期:
1995-01-28

文章信息/Info

Title:
Analysis of contact stress and temperature stress of sewing dam
作者:
孙利民
郑州工学院学报
Author(s):
Sun Limin
Journal of Zhengzhou Institute of Technology
关键词:
ADINA有缝坝接触应力温度应力
Keywords:
Adine with sewing dams contact stress temperature stress
文献标志码:
A
摘要:
本文用ADINA程序分析了故县水库8#电站坝段纵缝的接触应力与温度应力问题,在计算中利用ANINA中单元的“活”“死”选择功能,成功地模拟了坝段逐层向上修筑和逐步蓄水,承受温降等工况。
Abstract:
This article analyzes the contact stress and temperature stress problems of the vertical seams of the dam section of the county’s reservoir 8 # in the ADINA program. In the calculation, the "live" and "dead" selection function of the unit in ANINA successfully simulates the dam -up and gradually storage of the dam section by layer, and bears the conditions of temperature and drop.
更新日期/Last Update: 1900-01-01