[1]徐光先.龙头水库梯级电站群的经济运行[J].郑州大学学报(工学版),1994,15(02):29-34.
 Xu Guangxian.Economic operation of the dragon -headed reservoir step power station group[J].Journal of Zhengzhou University (Engineering Science),1994,15(02):29-34.
点击复制

龙头水库梯级电站群的经济运行()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
15卷
期数:
1994年02期
页码:
29-34
栏目:
出版日期:
1994-06-28

文章信息/Info

Title:
Economic operation of the dragon -headed reservoir step power station group
作者:
徐光先
郑州工学院
Author(s):
Xu Guangxian
Zhengzhou Institute of Technology
关键词:
梯级电站经济运行补偿调节
Keywords:
Steel power station economic operation compensation adjustment
文献标志码:
A
摘要:
针对农村中龙头水库梯级电站群的特点,建立了这类梯级电站群长期经济运行、短期经济运行的动态规划数学模型,提出了模型求解、补偿调节和时滞计算的方法。
Abstract:
Aiming at the characteristics of the ladder power station group in the rural leader reservoir, the long -term economic operation and short -term economic operation of this type of step power station group have been established, and the method of model solution, compensation adjustment and time -stagnation calculation are proposed.
更新日期/Last Update: 1900-01-01