[1]王伟,陈静波.时序法在核电站主泵振动监测中的应用[J].郑州大学学报(工学版),1991,12(02):67-74.
 Wang Wei,Chen Jingbo,Application of the timing method in the monitoring of the main pump vibration monitoring of the nuclear power plant[J].Journal of Zhengzhou University (Engineering Science),1991,12(02):67-74.
点击复制

时序法在核电站主泵振动监测中的应用()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
12卷
期数:
1991年02期
页码:
67-74
栏目:
出版日期:
1991-06-28

文章信息/Info

Title:
Application of the timing method in the monitoring of the main pump vibration monitoring of the nuclear power plant
作者:
王伟;陈静波;
郑州工学院数力系,郑州工学院数力系,
Author(s):
Wang Wei; Chen Jingbo;
Zhengzhou Institute of Technology Digital Power Department, Zhengzhou Institute of Technology Digital Power Department,
关键词:
时间序列法振动监测状态预报
Keywords:
Time sequence method vibration monitoring status forecast
文献标志码:
A
摘要:
本文简要阐述了时序法的基本原理。说明了应用时应注意的一些问题,最后将此法用于核电站主泵振动的监测,绘出预报与实测结果的比较。
Abstract:
This article briefly describes the basic principles of the sequential method. It illustrates some issues that should be paid attention to when applying, and finally use this method to monitor the vibration of the main pump of the nuclear power plant, and draw the comparison of forecasting and measured results.
更新日期/Last Update: 1900-01-01