[1]张太山,孟德臣.安阳市水资源动态模拟分析与安阳市水利发展规划[J].郑州大学学报(工学版),1994,15(04):91-96.
 Zhang Tai Mountain,Meng Dechen.Anyang water resources dynamic simulation analysis and Anyang water conservancy development plan[J].Journal of Zhengzhou University (Engineering Science),1994,15(04):91-96.
点击复制

安阳市水资源动态模拟分析与安阳市水利发展规划()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
15
期数:
1994年04期
页码:
91-96
栏目:
出版日期:
1994-12-28

文章信息/Info

Title:
Anyang water resources dynamic simulation analysis and Anyang water conservancy development plan
作者:
张太山孟德臣
安阳市水利局,河南省航运局
Author(s):
Zhang Tai Mountain Meng Dechen
Anyang Water Resources Bureau, Henan Provincial Shipping Bureau
关键词:
水资源计算机模拟分析水利规划
Keywords:
Water resources computer simulation analysis water conservancy planning
文献标志码:
A
摘要:
应用计算机技术进行水资源的评价分析是近来发展的一个新课题。本文详述了安阳市利用计算机对水资源的联合调度进行了动态模拟和评价分析。提出了未来年水资源合理利用和水利发展规划建议。为安阳市的工农业发展提供了重要决策依据。对其他地区也具有重要的参考价值。
Abstract:
Application of computer technology for evaluation of water resources is a new topic for recent development. This article detailed the dynamic simulation and evaluation analysis of the joint scheduling of water resources using computers. Proposals for the rational use of water resources and water conservancy development planning in the future. It provides an important decision -making basis for the development of the industrial and agricultural development of Anyang. It also has important reference value for other regions.

相似文献/References:

[1]李应选,刘金盾,赵继红.聚氯乙烯、聚苯乙烯及合成氨工艺过程计算机模拟软件系统开发[J].郑州大学学报(工学版),1998,19(02):30.
 [J].Journal of Zhengzhou University (Engineering Science),1998,19(04):30.
[2]周同和,郭弘,赵彤,等.“基础工程优化决策计算机咨询系统”的研制与开发[J].郑州大学学报(工学版),1997,18(04):94.
 Zhou Tonghe,Guo Hong,Zhao Tong,et al.The development and development of "Basic Engineering Optimization Decision Computer Consultation System"[J].Journal of Zhengzhou University (Engineering Science),1997,18(04):94.
[3]贾军国.企业整体资产评估中收益现值法的数学模型探讨[J].郑州大学学报(工学版),1996,17(03):82.
 Jia Junguo.Discussion on the mathematical model of the income current method in the overall asset assessment of the enterprise[J].Journal of Zhengzhou University (Engineering Science),1996,17(04):82.
[4]吴泽宁,丁大发,王振华.流域站年、月径流系列随机生成模型及应用[J].郑州大学学报(工学版),1996,17(02):7.
 Wu Zining,Ding Dafa,Wang Zhenhua.Random generation model and application of the year of the basin station and the monthly runoff series[J].Journal of Zhengzhou University (Engineering Science),1996,17(04):7.
[5]何争光,马跃先,俞宁.废水资源化与生态保护[J].郑州大学学报(工学版),1996,17(02):75.
 He Zongguang,Ma Yuexian,Yu Ning.Wastewater resources and ecological protection[J].Journal of Zhengzhou University (Engineering Science),1996,17(04):75.
[6]杨国英.计算机辅助管理系统设计[J].郑州大学学报(工学版),1995,16(02):70.
 Yang Guoying.Computer auxiliary management system design[J].Journal of Zhengzhou University (Engineering Science),1995,16(04):70.
[7]贾军国,陈永华.企业管理中人员定额和产量定额的计算[J].郑州大学学报(工学版),1994,15(03):107.
 Jia Junguo,Chen Yonghua.Calculation of personnel quotas and output quotas in enterprise management[J].Journal of Zhengzhou University (Engineering Science),1994,15(04):107.
[8]吴泽宁.经济区水资源优化分配的多目标投入产出模型[J].郑州大学学报(工学版),1990,11(03):81.
 Wu Zining,Multi -target input output model of water resources optimization and distribution in the economic zone[J].Journal of Zhengzhou University (Engineering Science),1990,11(04):81.

更新日期/Last Update: 1900-01-01