[1]张蓓,王建鹏,王复明,等.隧道超前小导管对掌子面稳定性影响分析[J].郑州大学学报(工学版),2009,30(04):30-34.
 ZHANG Bei,WANG Jianpeng,WANG Fuming,et al.Analysis of Tunnel Leading Conduit Affecting the Stability of Tunnel Face[J].Journal of Zhengzhou University (Engineering Science),2009,30(04):30-34.
点击复制

隧道超前小导管对掌子面稳定性影响分析()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
30
期数:
2009年04期
页码:
30-34
栏目:
出版日期:
1900-01-01

文章信息/Info

Title:
Analysis of Tunnel Leading Conduit Affecting the Stability of Tunnel Face
作者:
张蓓王建鹏王复明等.
郑州大学水利与环境学院,河南郑州,450001, 郑州大学水利与环境学院,河南郑州,450001, 郑州大学水利与环境学院,河南郑州,450001, 郑州大学水利与环境学院,河南郑州,450001
Author(s):
ZHANG Bei; WANG Jianpeng; WANG Fuming; etc
1.School of Civil Engineering,Zhengzhou University,Zhengzhou 450001,China;School of Environment and Water Conservan—cy Engineering,Zhengzhou University,Zhengzhou 450001,China
关键词:
隧道 超前小导管 开挖模拟 掌子面稳定性
Keywords:
tunnels Advance small catheters Excavation simulation Face stability
文献标志码:
A
摘要:
以河南省济(源)邵(原)高速公路王坑隧道为工程背景,利用ANSYS软件建立无超前小导管支护和有超前小导管超前支护两种工况下隧道三维有限元计算模型,通过隧道开挖模拟计算分析超前小导管对掌子面稳定性影响.计算结果表明:相对于无超前小导管工况,在有超前小导管工况下掌子面竖向的荷载和竖向应力以及掌子面水平方向位移都有一定程度的减少;改变超前小导管的环向分布范围和管径能够影响超前小导管的支护效果从而改善掌子面的受力情况.以上结果分析表明:超前小导管的存在增强了隧道掌子面的稳定性,使隧道的开挖过程更加安全.
Abstract:
Based on the result of shaking table test and Pushover analysis of SRC frame,the problem thatstrong column—weak beam failure mechanism is difficult to realize in practical composite flame is studied fromtwo aspects:the regulations incoordination on strong column—weak beam between reinforced concrete flameand steel frame and the seismic properties difference between steel beam and SRC column,basic defect anddeficiency of norm provision on internal force adjustment is demonstrated.Suggestions about internal force ad—justment coefficient for strong column-weak beam realization of composite flame and the imulation of SRCmembers are proposed.

相似文献/References:

[1]彭立敏,刘程,施成华,等.高速铁路站台列车风特性与人员安全性分析[J].郑州大学学报(工学版),2013,34(02):99.[doi:10.3969/j.issn.1671-6833.2013.02.025]
 PENG Li-min,LIU Cheng,SHI Cheng-hua,et al.Characteristics of the Train Wind and Analysis of Personnel Safetyin The High-speed Railway Station[J].Journal of Zhengzhou University (Engineering Science),2013,34(04):99.[doi:10.3969/j.issn.1671-6833.2013.02.025]
[2]杨伟超,彭立敏,黄娟,等.非平稳时序分析法在隧道施工变形预测中的应用[J].郑州大学学报(工学版),2008,29(01):132.
 Yang Weichao,PENG Limin,HUANG Juan,et al.Application of nonstationary time series analysis method in tunnel construction deformation prediction[J].Journal of Zhengzhou University (Engineering Science),2008,29(04):132.

更新日期/Last Update: 1900-01-01