[1]吴乃森,王元生,何涛..大跨度钢管混凝土拱桥地震响应分析[J].郑州大学学报(工学版),2009,30(03):30-34.
 WU Naisen,WANG Yuansheng,HE Tao..Analysis of Seismic Response for CFST Arch Bridge[J].Journal of Zhengzhou University (Engineering Science),2009,30(03):30-34.
点击复制

大跨度钢管混凝土拱桥地震响应分析()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
30
期数:
2009年03期
页码:
30-34
栏目:
出版日期:
1900-01-01

文章信息/Info

Title:
Analysis of Seismic Response for CFST Arch Bridge
作者:
吴乃森王元生何涛.
西北工业大学,力学与土木建筑学院,陕西,西安,710129, 漯河市交通局,河南,漯河,462400
Author(s):
WU NaisenWANG YuanshengHE Tao.
1.School of Mechanics,Civil Engineering and Architecture。Northwestern Polytechnic University,Xi’an 710072,China;2.Luohe City Department of Transportation,Luohe 462400,China
关键词:
钢管混凝土拱桥 地震响应 动力特性
Keywords:
CFST arch bridgeseismic responsedynamic characteristics
摘要:
利用有限元法建立大跨度钢管混凝土拱桥的结构模型,计算其自振性能,应用时程分析法,计算该桥考虑吊杆张力和拱肋初始应力影响的动力特性和地震响应,并与不计吊杆张力和拱肋初应力影响的桥梁动力特性和地震响应进行了比较,分析了该拱桥的结构抗震反应.结果表明,初始应力对于拱肋的力学性能影响不大,并满足设计要求,本桥抗震性能良好.
Abstract:
According to the structural feature of the bridge,spatial finite element analysis model is established to calculate its natural vibrations,by use of the seismic time—history response,dynamic characteristics and the seismic responses derived from history analysis are analyzed and compared whether under initial stress or not.The results show that the response of initial stress do not have too much effect on the bridge.The anti—seismic capability of the bridge is good.

相似文献/References:

[1]丁祖德,彭立敏,李兴龙..水下盾构隧道联络通道地震响应分析[J].郑州大学学报(工学版),2010,31(05):65.[doi:10.3969/j.issn.1671-6833.2010.05.016]
[2]王统宁,靳启文,胡兆同,等.连续梁桥施工阶段地震响应及抗震性能评估[J].郑州大学学报(工学版),2013,34(04):19.[doi:10.3969/j.issn.1671-6833.2013.04.005]
 WANG Tong-ning,JIN Qi-wen,HU Zhao-tong,et al.Seismic Response and Performance Assessment of Continuous Girder Bridge[J].Journal of Zhengzhou University (Engineering Science),2013,34(03):19.[doi:10.3969/j.issn.1671-6833.2013.04.005]
[3]徐建国,王博,陈淮,等.大型单墩渡槽流固耦合动力分析[J].郑州大学学报(工学版),2009,30(04):128.
 XU Jianguo,WANG Bo,CHEN Huai,et al.Dynamical Analysis of Large Scale Signal Pier Aqueductwith Fluid-structure Coupling[J].Journal of Zhengzhou University (Engineering Science),2009,30(03):128.
[4]戴鹏,郝宪武,狄谨..大跨径PC斜拉桥地震响应非线性分析[J].郑州大学学报(工学版),2006,27(04):79.[doi:10.3969/j.issn.1671-6833.2006.04.020]
 DAI Peng,HAO Xianwu,Di Jin.Nonlinear analysis of seismic response of long-span PC cable-stayed bridges [J].Journal of Zhengzhou University (Engineering Science),2006,27(03):79.[doi:10.3969/j.issn.1671-6833.2006.04.020]
[5]徐建国,王博..渡槽结构动力性能的有限元分析[J].郑州大学学报(工学版),1999,20(02):67.[doi:10.3969/j.issn.1671-6833.1999.02.022]
 Xu Jianguo,Wang Bo.Finite element analysis of dynamic properties of aqueduct structures[J].Journal of Zhengzhou University (Engineering Science),1999,20(03):67.[doi:10.3969/j.issn.1671-6833.1999.02.022]
[6]郭馨艳,曾桂香,王伟,等.大型储罐结构的动力性能分析[J].郑州大学学报(工学版),1999,20(02):80.[doi:10.3969/j.issn.1671-6833.1999.02.026]
 GUO Xinyan,Zeng Guixiang,WANG Wei,et al.Dynamic performance analysis of large tank structure[J].Journal of Zhengzhou University (Engineering Science),1999,20(03):80.[doi:10.3969/j.issn.1671-6833.1999.02.026]
[7]胡鹏辉,盛桂琳,杜文风,等.三心拱断面地下管廊结构地震动力响应分析[J].郑州大学学报(工学版),2024,45(05):135.[doi:10.13705/j.issn.1671-6833.2024.05.012]
 HU Penghui,SHENG Guilin,DU Wenfeng,et al.Seismic Dynamic Response Analysis of Underground Utility TunnelStructure with Three-core Arch Section[J].Journal of Zhengzhou University (Engineering Science),2024,45(03):135.[doi:10.13705/j.issn.1671-6833.2024.05.012]

更新日期/Last Update: 1900-01-01