相似文献/References:
[1]刘立新,刘中琦..螺旋肋钢丝(PC棒)预应力传递长度的试验研究[J].郑州大学学报(工学版),2009,30(04):11.
LIU Lixin,LIU Zhongqi.Experimental Study on the Transmission Length of Prestressed Reinforcementwith Helical Rib(PC Steel Bars)in Concrete[J].Journal of Zhengzhou University (Engineering Science),2009,30(03):11.
[2]郭馨艳,黄培彦,杨怡,等.预应力FRP增强RC梁界面剪应力分析[J].郑州大学学报(工学版),2007,28(01):60.[doi:10.3969/j.issn.1671-6833.2007.01.015]
GUO Xinyan,HUANG Peiyan,YANG Yi,et al.Interfacial shear stress analysis of prestressed FRP-reinforced RC beam[J].Journal of Zhengzhou University (Engineering Science),2007,28(03):60.[doi:10.3969/j.issn.1671-6833.2007.01.015]
[3]刘立新,安鸿飞,于秋波,等.淮河大桥35 m先张折线形箱梁预应力损失的研究[J].郑州大学学报(工学版),2007,28(04):12.[doi:10.3969/j.issn.1671-6833.2007.04.004]
LIU Lixin,An Hongfei,YU Qiubo,et al.Study on prestress loss of 35 m pre-tensioned linear box girder of Huaihe River Bridge[J].Journal of Zhengzhou University (Engineering Science),2007,28(03):12.[doi:10.3969/j.issn.1671-6833.2007.04.004]
[4]胡良明,李宗坤,王宗敏,等.小浪底2号进水塔工作门段预应力分析[J].郑州大学学报(工学版),2002,23(02):89.[doi:10.3969/j.issn.1671-6833.2002.02.026]
HU Liangming,Li Zongkun,WANG Zongmin,et al.Prestress analysis of working door section of Xiaolangdi No. 2 inlet tower[J].Journal of Zhengzhou University (Engineering Science),2002,23(03):89.[doi:10.3969/j.issn.1671-6833.2002.02.026]