[1]赵娟,陈淮,李天..超长高层建筑结构温度作用计算工况探讨[J].郑州大学学报(工学版),2003,24(03):37-40.[doi:10.3969/j.issn.1671-6833.2003.03.010]
ZHAO Juan,CHEN Huai,Li Tian.Discussion on the calculation of temperature effect of ultra-long high-rise building structure[J].Journal of Zhengzhou University (Engineering Science),2003,24(03):37-40.[doi:10.3969/j.issn.1671-6833.2003.03.010]
点击复制
超长高层建筑结构温度作用计算工况探讨()
《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]
- 卷:
-
24
- 期数:
-
2003年03期
- 页码:
-
37-40
- 栏目:
-
- 出版日期:
-
1900-01-01
文章信息/Info
- Title:
-
Discussion on the calculation of temperature effect of ultra-long high-rise building structure
- 作者:
-
赵娟; 陈淮; 李天.
-
哈尔滨工业大学土木工程学院,黑龙江,哈尔滨,150090, 郑州大学土木工程学院,河南,郑州,450002
- Author(s):
-
ZHAO Juan; CHEN Huai; Li Tian
-
-
- 关键词:
-
超长高层建筑; 温度作用; 温度工况
- Keywords:
-
- DOI:
-
10.3969/j.issn.1671-6833.2003.03.010
- 文献标志码:
-
A
- 摘要:
-
通过分析高层建筑物从施工到投入正常使用全过程中可能受到的温度荷载的类型,利用线性分布法计算作用在建筑物上温度荷载,完善温度作用和温差取值的计算,总结出确定温度作用计算工况的方法,给出了计算超长高层建筑结构水平温差的表达式,制定了超长高层建筑结构温度作用计算工况,以郑州第二长途电信枢纽工程主体结构为例,具体给出了各种温度作用工况的温度计算参数.实际计算表明,采用本文给出的超长高层建筑结构温度作用计算工况,可以满足实际超长高层建筑物温度问题计算需要.
- Abstract:
-
By analyzing the types of temperature loads that may be experienced in the whole process of high-rise buildings from construction to normal use, using the linear distribution method to calculate the temperature load acting on the building, improving the calculation of temperature action and temperature difference value, summarizing the method of determining the temperature action calculation condition, giving the expression for calculating the horizontal temperature difference of the structure of ultra-long high-rise building, and formulating the temperature action calculation condition of the ultra-long high-rise building structure, taking the main structure of the second long-distance telecommunications hub project in Zhengzhou as an example. The temperature calculation parameters of various temperature working conditions are given specifically. The actual calculation shows that the temperature calculation condition of the ultra-long high-rise building structure given in this paper can meet the temperature calculation needs of the actual ultra-long high-rise building.
更新日期/Last Update:
1900-01-01