[1]左其亭,吴泽宁..模糊风险计算模型及其应用研究[J].郑州大学学报(工学版),2001,22(03):78-80.[doi:10.3969/j.issn.1671-6833.2001.03.024]
 Zuo Qiting,Wu Zening.Fuzzy risk calculation model and its application[J].Journal of Zhengzhou University (Engineering Science),2001,22(03):78-80.[doi:10.3969/j.issn.1671-6833.2001.03.024]
点击复制

模糊风险计算模型及其应用研究()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
22
期数:
2001年03期
页码:
78-80
栏目:
出版日期:
1900-01-01

文章信息/Info

Title:
Fuzzy risk calculation model and its application
作者:
左其亭吴泽宁.
郑州大学环境与水利学院,, 郑州大学环境与水利学院,
Author(s):
Zuo Qiting; Wu Zening
关键词:
风险分析 模糊性 模糊风险 模型
Keywords:
DOI:
10.3969/j.issn.1671-6833.2001.03.024
文献标志码:
A
摘要:
基于模糊概率、风险分析计算方法,从定量的角度对带有模糊性的风险问题进行了研究,提出了模糊风险率、模糊风险度的概念及计算模型,并应用于洪水风险分析实践中,是对现有风险分析方法难以处理模糊性的有益补充.
Abstract:
Based on the fuzzy probability and risk analysis calculation methods, the ambiguous risk problems are studied from a quantitative perspective, and the concepts and calculation models of fuzzy risk rate and fuzzy risk degree are proposed, which are applied to the practice of flood risk analysis, which is a useful supplement to the ambiguity that is difficult to deal with by existing risk analysis methods.

相似文献/References:

[1]李宗坤,叶青,李锋..基于未确知网络分析法的土石坝风险分析研究[J].郑州大学学报(工学版),2012,33(01):11.[doi:10.3969/j.issn.1671-6833.2012.01.003]
 LI Zongkun,YE Qing,LI Feng.Risk Analysis of Earth-rock Dam Based on Unascertained Analytic Network Process[J].Journal of Zhengzhou University (Engineering Science),2012,33(03):11.[doi:10.3969/j.issn.1671-6833.2012.01.003]
[2]吴泽宁,王敬,赵南..水资源系统灰色风险计算模型[J].郑州大学学报(工学版),2002,23(03):22.[doi:10.3969/j.issn.1671-6833.2002.03.006]

更新日期/Last Update: 1900-01-01