相似文献/References:
[1]徐广涛,孙博,陈海宽,等.表面变质层硬度的压痕表征方法[J].郑州大学学报(工学版),2021,42(04):58.[doi:10.13705/j.issn.1671-6833.2021.04.017]
Xu Guangtao,Sun Bo,Chen Haikuan,et al.Indentation Characterization Method for Hardness of Surface-modified Layer[J].Journal of Zhengzhou University (Engineering Science),2021,42(02):58.[doi:10.13705/j.issn.1671-6833.2021.04.017]
[2]张琳娜,苗晓丹..基于GPS的PUMA数据库管理系统分析[J].郑州大学学报(工学版),2007,28(01):6.[doi:10.3969/j.issn.1671-6833.2007.01.002]
ZHANG Linna,Miao Xiaodan.GPS-based PUMA database management system analysis[J].Journal of Zhengzhou University (Engineering Science),2007,28(02):6.[doi:10.3969/j.issn.1671-6833.2007.01.002]
[3]许珉,王侠,李耀,等.实用短路计算与电气设备选择一体化程序研究[J].郑州大学学报(工学版),2005,26(02):39.[doi:10.3969/j.issn.1671-6833.2005.02.010]
Xu Min,Wang Xia,LI Yao,et al.Research on the integration of practical short circuit calculation and electrical equipment selection[J].Journal of Zhengzhou University (Engineering Science),2005,26(02):39.[doi:10.3969/j.issn.1671-6833.2005.02.010]
[4]王文义,张小红,陈铭..一个基于规范模式的管理信息系统实现方法[J].郑州大学学报(工学版),2004,25(03):90.[doi:10.3969/j.issn.1671-6833.2004.03.022]
WANG Wenyi,ZHANG Xiaohong,Chen Ming.A management information system implementation method based on a normative model[J].Journal of Zhengzhou University (Engineering Science),2004,25(02):90.[doi:10.3969/j.issn.1671-6833.2004.03.022]
[5]陈根永,王常飞..电力系统短期负荷预测系统的实现[J].郑州大学学报(工学版),2004,25(04):94.[doi:10.3969/j.issn.1671-6833.2004.04.024]
CHEN Genyong,Wang Changfei.Implementation of short-term load forecasting system for power system[J].Journal of Zhengzhou University (Engineering Science),2004,25(02):94.[doi:10.3969/j.issn.1671-6833.2004.04.024]
[6]潘诚,张健..ORACLE数据库在三维工厂设计软件PLANTSPACE中的应用[J].郑州大学学报(工学版),2002,23(02):54.[doi:10.3969/j.issn.1671-6833.2002.02.016]
Pan Cheng,Zhang Jian.ORACLE DATABASE IN 3D PLANT DESIGN SOFTWARE PLANTSPACE[J].Journal of Zhengzhou University (Engineering Science),2002,23(02):54.[doi:10.3969/j.issn.1671-6833.2002.02.016]
[7]刘德平,兰素萍..高校学生户口信息管理系统的开发[J].郑州大学学报(工学版),2001,22(03):108.[doi:10.3969/j.issn.1671-6833.2001.03.033]
LIU Deping,Lan Suping.Development of university student account information management system[J].Journal of Zhengzhou University (Engineering Science),2001,22(02):108.[doi:10.3969/j.issn.1671-6833.2001.03.033]
[8]易焱华,王昭慧..PowerBuilder中数据库数据的相互转移[J].郑州大学学报(工学版),1999,20(02):103.[doi:10.3969/j.issn.1671-6833.1999.02.034]
Yi Yanhua,Wang Zhaohui.Transfer of database data to and from PowerBuilder[J].Journal of Zhengzhou University (Engineering Science),1999,20(02):103.[doi:10.3969/j.issn.1671-6833.1999.02.034]
[9]陈勇孝,王雨虹,段银田,等.VB中通过重置DC的导航按钮访问数据库[J].郑州大学学报(工学版),1999,20(03):60.[doi:10.3969/j.issn.1671-6833.1999.03.020]
Chen Yongxiao,WANG Yuhong,Duan Yintian,et al.VB Access the database by resetting the DC’s navigation button[J].Journal of Zhengzhou University (Engineering Science),1999,20(02):60.[doi:10.3969/j.issn.1671-6833.1999.03.020]
[10]王世杰,张秉龄.热处理改善锰硼白口铸铁碳化物形态与分布的研究[J].郑州大学学报(工学版),1989,10(02):103.
[J].Journal of Zhengzhou University (Engineering Science),1989,10(02):103.