Economic operation of the dragon -headed reservoir step power station group
作者:
徐光先
郑州工学院
Author(s):
Xu Guangxian
Zhengzhou Institute of Technology
关键词:
梯级电站经济运行补偿调节
Keywords:
Steel power station economic operation compensation adjustment
文献标志码:
A
摘要:
针对农村中龙头水库梯级电站群的特点,建立了这类梯级电站群长期经济运行、短期经济运行的动态规划数学模型,提出了模型求解、补偿调节和时滞计算的方法。
Abstract:
Aiming at the characteristics of the ladder power station group in the rural leader reservoir, the long -term economic operation and short -term economic operation of this type of step power station group have been established, and the method of model solution, compensation adjustment and time -stagnation calculation are proposed.