[1]夏江涛,杨平..盾构出洞水平冻结加固杯形冻土壁温度场监测分析[J].郑州大学学报(工学版),2010,31(02):30.[doi:10.3969/j.issn.1671-6833.2010.02.007]
 Xia Jiangtao,Yang Ping.Temperature field monitoring and analysis of shield hole horizontal freezing reinforcement cup-shaped frozen soil wall[J].Journal of Zhengzhou University (Engineering Science),2010,31(02):30.[doi:10.3969/j.issn.1671-6833.2010.02.007]
点击复制

盾构出洞水平冻结加固杯形冻土壁温度场监测分析()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
31卷
期数:
2010年02期
页码:
30
栏目:
出版日期:
2010-02-02

文章信息/Info

Title:
Temperature field monitoring and analysis of shield hole horizontal freezing reinforcement cup-shaped frozen soil wall
作者:
夏江涛杨平.
淮阴工学院,建筑工程学院,江苏,淮安,223001;南京林业大学,土木工程学院,江苏,南京,210037, 南京林业大学,土木工程学院,江苏,南京,210037
Author(s):
Xia Jiangtao; Yang Ping
关键词:
盾构出洞 水平冻结 杯型冻土壁 温度场
Keywords:
DOI:
10.3969/j.issn.1671-6833.2010.02.007
文献标志码:
A
摘要:
依托于某地铁车站盾构出洞水平冻结加固工程,通过实时监测对杯型冻土壁温度场,分析了盐水温度、冻结区不同区域土体温度的发展特征,并计算了冻结区不同区域冻土壁交圈时间和发展速度.监测结果分析表明,同一测温孔内埋深较深的测点与埋深较浅的测点相比,板块加固体区的冻土交圈时间较长,发展速度较慢,而圆柱体加固区的冻土交圈时间与发展速度变化并不明显;冻土与地下连续墙闻界面处,板块加固区的冻土平均发展速度明显比圆柱体加固区快,圆柱体加固区冻土壁交圈时间为31 d,其平均发展速度为20.9 mm/d,而板块加固区不同区域冻土壁平均发展速度差异明显,最快发展速度为60.5 mm/d,最慢发展速度为35.3 mm/d.
Abstract:
Relying on the horizontal freezing reinforcement project of shield tunnels in a subway station, the development characteristics of brine temperature and soil temperature in different areas of the frozen zone were analyzed by real-time monitoring of the cup-shaped frozen soil wall temperature field, and the intersection time and development speed of the frozen soil wall in different areas of the frozen area were calculated. The analysis of monitoring results showed that compared with the measurement point with a deeper buried depth in the same temperature measuring hole, the frozen soil intersection time and development rate in the plate plus solid area were longer, and the development rate was slower, while the change of frozen soil intersection time and development speed in the cylinder reinforcement area was not obvious. At the interface between frozen soil and underground continuous wall, the average development rate of frozen soil in the plate reinforcement area was significantly faster than that in the cylindrical reinforcement area, and the intersection time of the frozen soil wall in the cylindrical reinforcement area was 31 d, and the average development rate was 20.9 mm/d, while the average development rate of frozen soil wall in different areas of plate reinforcement area was obvious, the fastest development rate was 60.5 mm/d, and the slowest development rate was 35.3 mm/d.

更新日期/Last Update: 1900-01-01