[1]季奎,马跃先,刘国昌,等.黄河小浪底水电站尾水岔管水力试验研究[J].郑州大学学报(工学版),1996,17(02):50-54.
 Ji Kui,Ma Yuexian,Liu Guochang,et al.Research on Hydropower Test Research on Tail Water Fork Tube of the Yellow River Small Landuroy[J].Journal of Zhengzhou University (Engineering Science),1996,17(02):50-54.
点击复制

黄河小浪底水电站尾水岔管水力试验研究()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
17卷
期数:
1996年02期
页码:
50-54
栏目:
出版日期:
1996-02-28

文章信息/Info

Title:
Research on Hydropower Test Research on Tail Water Fork Tube of the Yellow River Small Landuroy
作者:
季奎马跃先刘国昌张键
郑州工学院水环系
Author(s):
Ji Kui Ma Yuexian Liu Guochang Zhang Bian
Zhengzhou Institute of Technology Water Trail Department
关键词:
尾水岔管弱水跃绕流
Keywords:
The tail pipe weak water leap winding flow
文献标志码:
A
摘要:
通过模型试验研究,对小浪底水电站原尾水岔管体型进行了修改,减小水力损失,每年可多发千万kwh电,年效益达百万余元.
Abstract:
Through model test research, the original tail water fork tube of the small wave bottom hydropower station has been modified to reduce hydraulic losses. It can send more than 10 million KWH each year, with an annual benefits of more than one million yuan.
更新日期/Last Update: 1900-01-01