[1]申俊敏,张军,赵建斌.土工格栅加筋桥头相邻路堤的受力分析与计算[J].郑州大学学报(工学版),2014,35(02):28-31.[doi:10.3969/j.issn.1671-6833.2014.02.007]
SHEN Junmin,ZHANG Jun,ZHA0 Jianbin,et al.Calculation of Geogrid Reinforced for Alleviating Bump at Bridge Approach[J].Journal of Zhengzhou University (Engineering Science),2014,35(02):28-31.[doi:10.3969/j.issn.1671-6833.2014.02.007]
点击复制
土工格栅加筋桥头相邻路堤的受力分析与计算()
《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]
- 卷:
-
35
- 期数:
-
2014年02期
- 页码:
-
28-31
- 栏目:
-
- 出版日期:
-
2014-04-30
文章信息/Info
- Title:
-
Calculation of Geogrid Reinforced for Alleviating Bump at Bridge Approach
- 作者:
-
申俊敏; 张军; 赵建斌
-
- Author(s):
-
SHEN Junmin; ZHANG Jun; ZHA0 Jianbin; etc;
-
1. Key laboratory of Highway Construction and Maintenanee Techmique in Loess Area, Shanxi Provincial Research lnstitute olCommunieations, "Taiyuan 030006, China; 2. School of Civil Engineering and Arhitecture, Hubei University of Technology,Wuhan 430068.China
-
- Keywords:
-
bridge-head bump; geogrid; reinforeed embankment; analytical method; numerieal simulation
- DOI:
-
10.3969/j.issn.1671-6833.2014.02.007
- 文献标志码:
-
A
- Abstract:
-
The mechanism of the reinforeed bridge approach embankment with geogrid is firslly introdueed.Aecorling to the requirements of vertieal aeeeleration that human body travels with, the settlement require.ments of bridge approach are diseussed and the transition seetion length of reinforeed embankment for eomfortable driving is detemmined. The are assumplion is made to deseribe the settement curves and the Coulomb frie.tion is used to model the interlace characteristie between geogrid and soil. The stress of geogrid reinforeing theembankment is studied at last, the analytical expression to caleulate the axial tension forees of the geogrid isobtained, and it is veriied by the numerical simulation and practieal projeet.