相似文献/References:
[1]张兆宁,贺拴海,赵煜..基于应力控制箱梁截面设计数值模拟分析[J].郑州大学学报(工学版),2010,31(06):65.[doi:10.3969/j.issn.1671-6833.2010.06.016]
[2]刘健新,马麟,胡庆安..薄壁箱梁振动时的剪力滞效应[J].郑州大学学报(工学版),2008,29(03):122.[doi:10.3969/j.issn.1671-6833.2008.03.031]
LIU Jianxin,Ma Lin,Hu Qingan.Shear hysteresis effect when thin-walled box girder vibrates[J].Journal of Zhengzhou University (Engineering Science),2008,29(06):122.[doi:10.3969/j.issn.1671-6833.2008.03.031]
[3]王新玲,范建伟,王华..碳纤维布加固混凝土框架在竖向荷载下的试验研究[J].郑州大学学报(工学版),2006,27(04):14.[doi:10.3969/j.issn.1671-6833.2006.04.004]
WANG Xinling,FAN Jianwei,Wang Hua.Experimental study of carbon fiber cloth reinforced concrete frame under vertical load [J].Journal of Zhengzhou University (Engineering Science),2006,27(06):14.[doi:10.3969/j.issn.1671-6833.2006.04.004]
[4]朱秋菊,韩菊红,乐金朝..闸墩施工期温度应力仿真分析[J].郑州大学学报(工学版),2005,26(01):47.[doi:10.3969/j.issn.1671-6833.2005.01.012]
ZHU Qiuju,Han Juhong,Lejin Chao.Simulation analysis of temperature stress during gate pier construction[J].Journal of Zhengzhou University (Engineering Science),2005,26(06):47.[doi:10.3969/j.issn.1671-6833.2005.01.012]
[5]孔琴,刘立新..碳纤维布加固钢筋混凝土梁受弯性能的试验研究[J].郑州大学学报(工学版),2004,25(04):24.[doi:10.3969/j.issn.1671-6833.2004.04.007]
KONG Qin,Liu Lixin.Experimental study on bending performance of reinforced concrete beams reinforced with carbon fiber cloth[J].Journal of Zhengzhou University (Engineering Science),2004,25(06):24.[doi:10.3969/j.issn.1671-6833.2004.04.007]
[6]朱文正,陈淮..梯形截面箱梁扭心位置计算[J].郑州大学学报(工学版),2001,22(02):77.[doi:10.3969/j.issn.1671-6833.2001.02.023]
ZHU Wenzheng,Chen Huai.Calculation of torsional position of trapezoidal section box girder[J].Journal of Zhengzhou University (Engineering Science),2001,22(06):77.[doi:10.3969/j.issn.1671-6833.2001.02.023]
[7]王仁义,刘延生,毕苏萍,等.混凝土结构温度裂缝浅析[J].郑州大学学报(工学版),2001,22(02):100.[doi:10.3969/j.issn.1671-6833.2001.02.031]
Wang Renyi,Liu Yansheng,Pi Suping,et al.Analysis of temperature cracks in concrete structures[J].Journal of Zhengzhou University (Engineering Science),2001,22(06):100.[doi:10.3969/j.issn.1671-6833.2001.02.031]
[8]张同德,胡良明,周鸿钧..昭平台水库溢洪道闸墩裂缝非线性有限元分析[J].郑州大学学报(工学版),2001,22(04):49.[doi:10.3969/j.issn.1671-6833.2001.04.014]
ZHANG Tongde,HU Liangming,Zhou Hongjun.Nonlinear finite element analysis of cracks in spillway piers in Zhaotai Reservoir[J].Journal of Zhengzhou University (Engineering Science),2001,22(06):49.[doi:10.3969/j.issn.1671-6833.2001.04.014]