[1]吴建平,吴桢祥,刘国昌,等.低佛氏数宽尾墩水跃消能问题试验研究[J].郑州大学学报(工学版),1993,14(02):30-37.
 Wu Jianping,Wu Yanxiang,Liu Guochang,et al.Test research on the problem of low Buddha’s number wide tail pier water leap energy[J].Journal of Zhengzhou University (Engineering Science),1993,14(02):30-37.
点击复制

低佛氏数宽尾墩水跃消能问题试验研究()
分享到:

《郑州大学学报(工学版)》[ISSN:1671-6833/CN:41-1339/T]

卷:
14
期数:
1993年02期
页码:
30-37
栏目:
出版日期:
1993-06-28

文章信息/Info

Title:
Test research on the problem of low Buddha’s number wide tail pier water leap energy
作者:
吴建平;吴桢祥;刘国昌;
郑州工学院水环系,郑州工学院水环系,郑州工学院水环系,
Author(s):
Wu Jianping; Wu Yanxiang; Liu Guochang;
Zhengzhou Institute of Technology Water Trail, Zhengzhou Institute of Technology, Water Trail, Zhengzhou Institute of Technology,
关键词:
在低坝或低佛氏数水跃消能中宽尾墩的应用使水流结构发生了巨大变化。黄河大峡水电站溢洪道宽尾墩消能方案研究中这一情况非常明显。这一特有的水流形态可称之谓宽尾墩水跃。本文首先对宽尾墩水跃的机理进行了定性描述并且对宽尾墩水跃中几个关键问题进行了论述:通过波浪要素的量测分析了宽尾墩对水跃的跃后波浪的抑制作用通过流速和紊动强度的量测计算分析了宽尾墩水跃后紊动强度分布与消能效率借助压力传感器和一套分析处理系统揭示了宽尾墩水跃消力沲底板脉动荷载的变化规律。实验证明:与高坝宽尾墩消能相比宽尾墩在低坝消能
Keywords:
Fluttering and eliminating energy Low Buddha’s Number Width Tail Pier (Calling Pond)
文献标志码:
A
摘要:
底流消能;;低佛氏数;;宽尾墩(消力池)
Abstract:
Among the low dams of the low dam or low Buddha, the application of the wide -tail pier has changed the water flow structure. The situation is very obvious in the study of the wide -tailed pier of the Yellow River Hydropower Station in the flooding road. This unique water flow form can be called a wide -tailed pier water leap. This article first describes the mechanism of wide -tail pier water leaps, and discusses several key issues in the wide -tailed pier water leaps: through the measurement of the wave element, the inhibitory effect of the wide tail pier on the wavy waves is analyzed; through the measurement of the flow rate and the intensity of the turbulent strength, the intensity distribution and energy efficiency of the wide -tail pier water leaps are analyzed; The pressure sensor and a set of analysis and processing systems reveal the changes in the pulse load of the bottom plate of the wide -tailed pier. Experiments have proved that compared with the high -end pier elimination energy of the high dam, the wide -tail pier is also very effective in the low dam power elimination energy. Use a pier -pool -a binding of the elimination type. It can effectively suppress downstream waves, stabilize the energy body, adjust the flow rate distribution, reduce the low energy of the lower reaches of the lower reaches of the lower reaches, and reduce the low energy of the Buddha’s digital water leap energy, and reduce the scouring of the downstream of the building. Of course, in the specific application of this elimination type, other problems involved in the project must also be considered.
更新日期/Last Update: 1900-01-01